• xmlui.mirage2.page-structure.header.title
    • français
    • English
  • Help
  • Login
  • Language 
    • Français
    • English
View Item 
  •   BIRD Home
  • LAMSADE (UMR CNRS 7243)
  • LAMSADE : Publications
  • View Item
  •   BIRD Home
  • LAMSADE (UMR CNRS 7243)
  • LAMSADE : Publications
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Browse

BIRDResearch centres & CollectionsBy Issue DateAuthorsTitlesTypeThis CollectionBy Issue DateAuthorsTitlesType

My Account

LoginRegister

Statistics

Most Popular ItemsStatistics by CountryMost Popular Authors
Thumbnail - Request a copy

Time Cost Quality Trade-off Problems: A survey exploring the assessment of quality

Bou Orm, Mayassa; Jeunet, Jully (2018), Time Cost Quality Trade-off Problems: A survey exploring the assessment of quality, Computers & Industrial Engineering, 118, p. 319-328. 10.1016/j.cie.2018.01.012

Type
Article accepté pour publication ou publié
Date
2018
Journal name
Computers & Industrial Engineering
Volume
118
Pages
319-328
Publication identifier
10.1016/j.cie.2018.01.012
Metadata
Show full item record
Author(s)
Bou Orm, Mayassa
Laboratoire d'analyse et modélisation de systèmes pour l'aide à la décision [LAMSADE]
Jeunet, Jully
Laboratoire d'analyse et modélisation de systèmes pour l'aide à la décision [LAMSADE]
Abstract (EN)
Time Cost Trade-off Problems have received considerable attention in the literature on deterministic project scheduling problems but integrating the quality factor to these problems dates back to the mid-nineties with the pioneering work of Babu and Suresh (1996). Since then, to the best of our knowledge, about twenty papers have been published on this topic. The present paper analyses these Time Cost Quality Trade-off Problems in light of the usual classification for Time Cost Trade-off Problems that is based upon the number and category of resources and on the continuous or discrete type of the relationship between duration and cost or resources utilisation. In this survey, the emphasis is on the definition of project activities quality and on aggregation methods used to derive the overall project quality. We report the absence of a direct relationship between quality and resources allocated to activities and a lack of use of the lexicographic method to solve the problem.
Subjects / Keywords
Time Cost Quality Trade-off Problems; Project scheduling; Project crashing; Activity quality; Project quality

Related items

Showing items related by title and author.

  • Thumbnail
    Optimizing temporary work and overtime in the Time Cost Quality Trade-off Problem 
    Jeunet, Jully; Bou Orm, Mayassa (2018) Article accepté pour publication ou publié
  • Thumbnail
    Optimizing temporary work and overtime in the Time Cost Quality Trade-off Problem 
    Jeunet, Jully; Bou Orm, Mayassa (2020) Article accepté pour publication ou publié
  • Thumbnail
    A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs 
    Jonard, Nicolas; Dellaert, Nico; Jeunet, Jully (2000) Article accepté pour publication ou publié
  • Thumbnail
    CSR related management practices and Firm Performance: An Empirical Analysis of the Quantity-Quality Trade-off on French Data 
    Crifo, Patricia; Diaye, Marc-Arthur; Pekovic, Sanja (2016-01) Article accepté pour publication ou publié
  • Thumbnail
    Corporate Social Responsibility related management practices and Firm Performance: An Empirical Analysis of the Quantity-Quality Trade-off on French Data 
    Crifo, Patricia; Diaye, Marc-Arthur; Pekovic, Sanja (2013-04) Document de travail / Working paper
Dauphine PSL Bibliothèque logo
Place du Maréchal de Lattre de Tassigny 75775 Paris Cedex 16
Phone: 01 44 05 40 94
Contact
Dauphine PSL logoEQUIS logoCreative Commons logo