• xmlui.mirage2.page-structure.header.title
    • français
    • English
  • Help
  • Login
  • Language 
    • Français
    • English
View Item 
  •   BIRD Home
  • LAMSADE (UMR CNRS 7243)
  • LAMSADE : Publications
  • View Item
  •   BIRD Home
  • LAMSADE (UMR CNRS 7243)
  • LAMSADE : Publications
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Browse

BIRDResearch centres & CollectionsBy Issue DateAuthorsTitlesTypeThis CollectionBy Issue DateAuthorsTitlesType

My Account

LoginRegister

Statistics

Most Popular ItemsStatistics by CountryMost Popular Authors
Thumbnail

Optimal sequencing of mixed models with sequence-dependent setups and utility workers on an assembly line

Giard, Vincent; Jeunet, Jully (2010), Optimal sequencing of mixed models with sequence-dependent setups and utility workers on an assembly line, International Journal of Production Economics, 123, 2, p. 290-300. http://dx.doi.org/10.1016/j.ijpe.2009.09.001

View/Open
IJPE_Jeunet_Giard.pdf (270.2Kb)
Type
Article accepté pour publication ou publié
Date
2010
Journal name
International Journal of Production Economics
Volume
123
Number
2
Publisher
Elsevier
Pages
290-300
Publication identifier
http://dx.doi.org/10.1016/j.ijpe.2009.09.001
Metadata
Show full item record
Author(s)
Giard, Vincent
Jeunet, Jully
Abstract (EN)
This paper presents an integer programming formulation for the sequencing problem in mixed-model assembly lines where the number of temporarily hired utility workers and the number of sequence-dependent setups are to be optimized simultaneously through a cost function. The resultant model offers an operational way to implement the utility work needed to avoid line stoppages, unlike previous papers addressing the goal of smoothing the workload. The present research has an immediate application to the automotive industry, namely to the car-sequencing problem. Simulation results show that the proposed formulation leads to the optimum in a reasonable time for instances up to 15 items and to satisfactory feasible solutions for some of the larger problems we considered within a moderate time limit.
Subjects / Keywords
Utility workers; Economic evaluation; Mixed-model assembly lines; Sequencing; Spacing constraints; Sequence-dependent setups
JEL
M11 - Production Management

Related items

Showing items related by title and author.

  • Thumbnail
    Optimal stock-out risk when demand is driven by several mixed-model assembly lines in the presence of emergency supply 
    Sali, Mustapha; Giard, Vincent (2015-06) Article accepté pour publication ou publié
  • Thumbnail
    A DSS approach for heterogeneous parallel machines scheduling with due windows, processor-&-sequence-dependent setup and proximate supply chain constraints 
    Azzamouri, Ahlam; Essaadi, Imane; Fenies, Pierre; Fontane, Frédéric; Giard, Vincent (2016) Document de travail / Working paper
  • Thumbnail
    Modeling sequence scrambling and related phenomena in mixed-model production lines 
    Rudolf, Gabor; Noyan, Nilay; Giard, Vincent (2014) Article accepté pour publication ou publié
  • Thumbnail
    Heuristic solution methods for the selective disassembly sequencing problem under sequence-dependent costs 
    Jeunet, Jully; Della Croce, Federico; Salassa, Fabio (2021) Article accepté pour publication ou publié
  • Thumbnail
    Optimal stock-out risk for a component mounted on several assembly lines in case of emergency supplies 
    Sali, Mustapha; Giard, Vincent (2014) Communication / Conférence
Dauphine PSL Bibliothèque logo
Place du Maréchal de Lattre de Tassigny 75775 Paris Cedex 16
Phone: 01 44 05 40 94
Contact
Dauphine PSL logoEQUIS logoCreative Commons logo